Blog and News Updates
Check back often for updates!
When you drive past a bustling new housing development, it’s easy to focus on the framing, the rooftops, and the finished homes. But before a single piece of wood can be cut or a lone foundation poured, massive structural work has to take place right in the dirt.
Right now, we are out at the Olympic Heights development in Shelton, WA, and we are at the absolute ground floor of the project. There isn't a single home or building standing on this site yet. It is a vast, raw canvas of earth, and our team at B&R is tasked with turning this rugged landscape into a rock-solid, perfectly engineered foundation for the future community.
In the Pacific Northwest, starting a development correctly means handling one massive factor right out of the gate: smart water management and slope stabilization.
Building structural retaining walls for a project of this scale isn't just about stacking materials—it is a high-stakes jigsaw puzzle. If you look closely at our active site photos, you can spot our crew members standing right on top of the sweeping stone structures. Swapping a person into the frame next to those multi-ton boulders puts the true, massive size of this operation into perspective.
Every single stone requires flawless teamwork between our sharp ground crews and our skilled heavy machinery operators. These rockeries do the heavy lifting behind the scenes, fighting soil erosion and stabilizing massive slopes. In the PNW, where heavy rains can quickly saturate the ground and put immense pressure on hillsides, building these walls with precision right now ensures that the ground beneath this future neighborhood stays exactly where it belongs for decades to come.
Down in the basin, our next major infrastructure milestone is already taking shape: the community retention pond. While it is empty of neighborhood housing right now, it is fully prepared for the heavy winter rains ahead.
When downpours eventually hit the future roofs, roads, and driveways of Olympic Heights, this basin will act as a giant catching system to prevent local flooding. If you look at the center of the pond, you’ll notice a massive concrete block wall splitting it in half. That is an engineered baffle wall. By forcing incoming runoff to pool on one side first, it traps heavy mud and sediment in a single, controllable spot so the system stays clean and runs efficiently.
Shaping a brand-new community from scratch is hard, heavy work, but we love the challenge of setting the stage for what's to come. One massive boulder and precise cut at a time, we're building a rock-solid future for Shelton.
As the water begins to collect in the basin, it won’t just be stormwater filling the space. In the Pacific Northwest, it doesn't take long for nature to find a new water source. We fully expect the Olympic Heights pond to become a bustling local sanctuary for waterfowl like ducks and geese, alongside frogs and aquatic insects.
While it’s always great to provide areas where local wildlife can frolic, balancing nature with neighborhood infrastructure is a careful science. From an engineering standpoint, wildlife and heavy bird populations introduce high levels of nutrients and bacteria into the water. That is another reason why our heavy-duty block baffle wall is so crucial. By keeping the water moving properly and settling out heavy debris on one side, the pond can do its industrial cleanup work beneath the surface while still letting local wildlife enjoy the habitat above.